Equipment Record Design Change for Make/Model
The workflow process on the Equipment window has been revised to move the Base PM Date field and add a Select Repair Center flyout.
The Base PM Date was in the Dates section. It is now in the General Information section.
When you select a Make/Model Type, the Base PM Date field becomes required if the Make/Model has PM schedules.
An entry in the Base PM Date field triggers the following alert: "When a make/model is linked, populating the base PM Date will create PM schedules based on the make/model and risk level. Continue?"
When you click OK on the alert, the Select Repair Center flyout opens – if the record does not have any linked Repair Centers.
When you select and save a Repair Center on the flyout, the RC is added to the Equipment / Repair Centers Tab.
If the Make/Model / PM record has no RC, it defaults to the selected RC.
When you select and save a Repair Center on the flyout, the RC is added to the Equipment / Repair Centers Tab.
If the Make/Model / PM record has no RC, it defaults to the selected RC.
Audit History View Added for Direct Database Access
If you have purchased Direct Database Access, the Audit History View is now available.
This is a view to access when you build your own reports. It is available if your organization has purchased Direct Database Access.
Bill of Materials Includes Data Table View
A new data table view has been added to the Bill of Materials window.
You now have the option to see the Bills of Materials as a list or a data table that includes more information about each BoM.
Click the icons above the list or table to switch from one view to another.