Task Check Group Enhancement
Path: Organization > Task > Task Check Group
The Task Check Group window is a convenient way to add several Master Checks to one record. You can now search and filter for Master Checks from the Task Check Group window.
If you have numerous Master Checks (Organization > Task > Master Check), this enhancement gives you a way to quickly locate the records you need.
A Master Check Code column has been added to the results grid, and the check Code, Check Type Code, and SubType Code criteria have been added to the drop-down list on the Task Check Entry flyout as well as the grid on the flyout.
In addition, a Find button was added in the Filter Criteria section to make it more accessible and intuitive to the user.
MTTR and MTBF Report Added to Report Manager
Path: Reports > Report Manager / PM
A new report has been added to the PM category of the Report Manager to calculate the average time it takes to repair a failed component and the reliability of a component.
The report is titled Equipment Availability with MTTR and MTBF.
Based on posted downtime, the report shows in hours the Available Time, Uptime, Downtime, MTBF, and MTTR for a range of equipment in a Facility, Building, and Area.
In addition to Start Date and End Date, you have the option to limit the results based on Repair Center, Facility, Building, and Equipment Type. The report is identified as Special, which means it cannot be copied and recreated.
- MTTR – Mean Time To Repair
- MTBF – Mean Time Before Failure
PM Efficiency by Location Report Added to Report Manager
Path: Reports > Report Manager / PM
A new report has been added to the PM category of the Report Manager to calculate and evaluate PM Efficiency by Location in WebTMA.
The report is titled PM Efficiency Report by Location.
The report shows the total amount of PM’s generated and the total completed within a given time range. It also displays your efficiency percentage by Building, and the totals by Building.
Also, it displays your average efficiency percentage for all Buildings within the selected time range.
In addition to Request Date and Completion Date, you have the option to limit the results based on Repair Center and Facility.
The report is identified as Special, which means it cannot be copied and recreated.
Key Adjustment Reports Added
Path: Material > Key Management > Key Adjustments
The Key Adjustments window is used for numerous transactions that involve Keys.
Several reports have been added to the Reports section of the Navigation Panel to help speed up your use of the Key Module.
The following reports are now available:
- Key Issuance Receipt
- Key Lost Receipt
- Key Return Receipt
- Key Ring Issuance Receipt